Latest Travel News
|
Latest bus information from Stagecoach Routes E3 & E4 to be replaced by a single service, Route E3. From Monday 30th January 2012 Routes E3 and E4 are being replaced by a single service, Route E3. Unfortunately due to changes in traffic conditions as well as delays caused due to the Abertillery regeneration works and the time required to divert to serve Ysbyty Aneurin Bevan, it has not been possible to operate the services reliably, and our monitoring has shown that services have become progressively late during the day. It is therefore not possible to continue to operate the services in their current form. New Route E3 will operate from Brynmawr to Garn Lydan via Blaina, Abertillery, Aberbeeg, Cwm, Waunlwyd and Ebbw Vale and return. This service will continue to operate at an hourly frequency. Service E8 has also been incorporated into new Route E3, therefore passengers from the Garn Lydan and Rassau areas will benefit from an hourly through bus to the Hospital, Festival Shopping, Cwm and Aberbeeg. Whilst there will be some loss of accessibility between Brynmawr and Ebbw Vale, passengers wishing to travel directly between Brynmawr and Ebbw Vale will continue to be able to use the X4 service which operates at a 30 minute frequency Service changes from 9th January 2012. Route 56 Blackwood to Newport From 9 January 2012 Stagecoach are pleased to announce Monday to Saturday daytime frequency between Blackwood and Newport on the above route has increased to every 15 minutes. 120/130 124 132 136 & X32 Minor retimings will apply on these routes from 9 January 2012 The number of journeys will remain unchanged but some times are changed by up to 5 minutes to more accurately reflect the time it takes between stops. X24 Blaenavon to Newport X33 Pontypool to Abergavenny 19 Newport to Pontypool 82 Pontypool to Coleg Gwent, Crosskeys Service Changes from 23 January 2012 Service Changes from 23 January 2012 Route 5: Blackwood - Oakdale - Newbridge - Pantside The route between Crumlin Square and Newbridge will be via Mining School Hill, Martins Field and High Street in both directions. Therefore all journeys to Pantside will depart from Newbridge Hotel and opposite The Co-operative not Ebbw View Terrace. The Sunday timetable between Newbridge and Pantside remains unchanged however buses will show route 5 and depart from opposite The Co-operative not Ebbw View Terrace.
Closure of Central Way at University Hospital of Wales (Heath Hospital) Closure of Central Way, Heath Hospital until 2013 Due to work on the second phase of the Childrens’ Hospital at University Hospital of Wales, Central Way will be closed from Sunday 6 November for a period of approximately two years. As a result, routes and stops will need to be changed. Buses travelling towards Cardiff will enter the hospital from Gabalfa and stop at the Gateway (near A & E). In this direction, buses will stop in Rhydhelig Avenue only. All other stops at the hospital will not be served. From Cardiff, the only stops served at the hospital will be the Gateway (opposite A & E, outside the car park) and at Academic Avenue near the Dental Hospital. A guide detailing the new stop arrangements is available by clicking here. |
Latest Road News from Traffic Wales A55 : A55 : Both directions : J16 to J17 Conwy West : Maintenance works : Width limit 3.20m : 22/11/11 1900hrs - 24/11/11 0700hrs
|
|
|
Trains between Barry and Bridgend may be delayed due to a broken down train #fb Feb 6, 2012 12:31 pm Good afternoon, there are minor delays because of signalling problems near Birmingham. Please check here - http://t.co/dahYaYkk #fb Feb 6, 2012 7:02 am UPDATE: Delays at Birmingham New Street until further notice http://t.co/MleMyVr3 #fb Feb 6, 2012 5:50 am @amydstabler hi, trains are calling at all stops again now Feb 6, 2012 2:16 am DISRUPTION CLEARED: Trains between Bridgend and Cardiff Central via Pencoed are now running normally #fb Feb 6, 2012 2:01 am ONGOING: Buses replace trains between Bridgend and Cardiff Central via Pencoed until approximately 09:00 http://t.co/rllE7S8W #fb Feb 6, 2012 12:15 am @fenywfach Hi, that trains was delayed by over running engineering works Feb 5, 2012 11:12 pm NEW: Buses replace trains between Bridgend and Cardiff Central via Pencoed until approximately 09:00 http://t.co/rllE7S8W #fb Feb 5, 2012 8:52 pm CLEARED:Trains between Warrington Central/Salford Crescent/Eccles-Manchester Oxford Rd have finished. Normal service in the morning #fb Feb 5, 2012 5:50 pm UPDATE: Delays between Warrington Central/Salford Crescent/Eccles -Manchester Oxford Rd until further notice http://t.co/mt9h8ykp #fb Feb 5, 2012 2:52 pm |



